Sollmann Logo

Performance Counts...

Wilson Memorial Hospital New Cardiovascular Cath Lab

Sidney, Ohio

Renovation of existing lab to accommodate new cardiovascular cath lab equipment.  Now local patients can stay close to home for their cardiac healthcare needs.  Sollmann Electric Co. is proud to have been the electrical contractor for this project.  This is a great addition to our local hospital's services!

wmc06  WMC01

WMC15  WMC12

WMC16  WMC17  WMC18

 

 

St. Marys New 6-12 High / Middle School

St. Marys, Ohio

Winner of the "Subcontractor Project of the Year" award and the

"Award of Excellence" presented by the

Ohio Valley Associated Builders and Contractors, Inc.

St Marys1

  • 210,000 Square Foot Building
  • Approximately 70 classrooms
  • 2 large gymnasiums
  • Large auditorium
  • Large commons / dining area
st marys2
St Marys3 st marys4
   

st marys6

 

Ross Casting & Innovation, LLC

New Industrial Facility

Sidney, Ohio

 

This 125,000 square foot new industrial facility was built for the production expansion needs of the leading producer of aluminum turbocharger wheels for engines.

 

ross1 ross2
Main High Voltage Switch Main Transformers
ross3 ross4
Chiller Pump System Main Switchgear


Miscellaneous Busway, Switchgear, and Equipment Hookup -- Ross Casting and Innovation

ross5 ross6
ross7 ross8
ross9 ross10
   

 

Mary Rutan Hospital Emergency Department
Expansion & Renovation

Bellefontaine, Ohio

Winner of an
"Award of Excellence"
presented by the
Ohio Valley Associated Builders and Contractors, Inc.
and IEC National Award of Excellence
  • 17,000 sq ft. renovation project plus the 17,000 sq ft. addition to the hospital totaled 34,000 square feet. The former emergency department was 3,300 sq ft.
  • State-of-the-art treatment areas, private entrance areas, as well as a centralized nursing station give patients the best attention and treatment needed.
  • Twelve new electrical panels were installed to distribute electric to the new addition and renovation. New conduit was added to the main electrical panel in order to distribute electric to the new panel rooms. A new transformer was added to maintain generator capabilities for the new electric panels. New nurse call and security/fire alarm systems were also installed.

Although challenging, this two-year electrical construction project was completed with minimal disruption of power to lift support equipment, other medical equipment, and the hospital's overall operations.